We install professional floor coating systems for homeowners and businesses across Greater Vancouver and BC. Every installation starts with diamond grinding and moisture testing — the two steps most contractors skip, and the main reason most epoxy floors fail within a few years in this climate.
(604) 742-9479
Epoxy Floor Vancouver installs professional floor coating systems for residential and commercial clients across Greater Vancouver, the Fraser Valley, and Vancouver Island.
We specialize in epoxy garage floors, metallic epoxy feature floors, polyaspartic coatings, polished concrete, microcement, and commercial floor systems — installed using the same multi-coat methods used in industrial and pharmaceutical-grade environments.
Greater Vancouver's coastal climate creates specific challenges that most flooring companies don't address properly. The combination of high annual rainfall, one of the highest water tables in Canada, and a large proportion of older concrete slabs means that moisture vapour emission is a factor on a significant percentage of the floors we test. Applying standard epoxy to a slab with elevated MVER without a moisture-tolerant primer is the single most common reason epoxy floors fail in this market.
Our technique was developed under the most respected floor coating specialists in North America — the kind of instructors who set the standard for professional installers across the continent. Not weekend certification courses. Not manufacturer sales training. The real thing — hands-on, systems-level mastery of prep chemistry, moisture science, and multi-coat application technique. We brought that back to Vancouver and apply it to every job we take, residential or commercial.
We test every slab before we specify a system. We document results. We apply a moisture-tolerant primer rated for up to 25 lbs per 1,000 sq ft per 24 hours when required. And we provide written warranties on workmanship before any work begins.
These aren't optional steps we upsell. They're the baseline for every installation we do — regardless of the system, the square footage, or the budget.
Calcium chloride MVER test and RH probe measurement on every slab before any system is specified. Results documented and shared with the client. Non-negotiable — this is what WorkSafeBC requires on all coating installations.
Every slab is ground to CSP 2–3 profile using industrial diamond grinders. No acid etching, no shot blast substitution for residential work. Mechanical profile is what allows epoxy to bond at the molecular level — not just sit on the surface.
Applied on every Vancouver installation — rated for up to 25 lbs MVER. On high-moisture slabs, a dedicated vapour barrier coat is applied as a separate layer before the decorative system. This is the step most contractors skip.
Minimum three coats on every residential installation: primer, high-build base coat at 8–10 wet mils, and UV-stable polyaspartic topcoat at 4–5 wet mils per coat. No single-coat systems.
Every project receives an itemized written quote before any work begins. No verbal estimates, no surprises at billing. The quote is confirmed at a free on-site assessment with no obligation to proceed.
Written warranty covering adhesion failure, delamination, and surface defects caused by improper installation. Warranty documentation provided at project handover along with care instructions.
Our installation technique wasn't learned from a weekend course or a manufacturer's rep. It was developed under the most respected floor coating specialists in North America — the standard-setters behind elite commercial and residential installations from coast to coast. That level of training changes how you approach every slab.
We get calls every week from homeowners whose epoxy floor is peeling within two years of installation. In almost every case, the cause is the same: moisture.
Greater Vancouver has one of the highest water tables in Canada. Combined with the coastal climate's above-average annual rainfall, a large proportion of Metro Vancouver slabs — especially those in Richmond, Delta, Burnaby, Coquitlam, and below-grade suites throughout the city — have moisture vapour emission rates above the threshold that standard epoxy requires.
A slab can look and feel completely dry on the surface and still be transmitting moisture vapour at rates that will cause a coating to delaminate within 12–24 months. The only way to know is to test. We test every slab. We document it. And we specify the system accordingly.
This is why our installations last 10–15 years and why floors installed without this step fail in 2–3. The coating itself is the same. The prep is what changes the outcome.
For more on BC floor coating standards, see the BC Building Code standards and WorkSafeBC construction guidelines.
We install epoxy flooring throughout Metro Vancouver, the Fraser Valley, the North Shore, and Vancouver Island.
For projects outside these areas, call us at (604) 742-9479 to confirm coverage.
Free on-site assessment. Written quote before any work begins. No obligation.